New TopShim run:

version = topshim 2.1.0
date = 2024-01-31
time = 15:28:33.691
command = topshim 

FINE SHIMMING

Parameters:

probe = Z163739_0168
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration 1: FWHM Before= 4.7 Hz, Target= 0.2 Hz, After= 0.8 Hz
Iteration 2: FWHM Before= 0.8 Hz, Target= 0.8 Hz, After= 1.0 Hz
Iteration 3: FWHM Before= 1.0 Hz, Target= 0.5 Hz, After= 0.6 Hz
Iteration 4: FWHM Before= 0.6 Hz, Target= 0.3 Hz, After= 0.7 Hz
Iteration 5: FWHM Before= 0.7 Hz, Target= 0.4 Hz, After= 0.9 Hz
Iteration 6: FWHM Before= 0.9 Hz, Target= 0.4 Hz, After= 0.4 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.679

shim changes: 
Z	+9
Z2	+107
Z3	-289
Z4	-209
Z5	+138
Z6	+2564
Z7	-6991
Z8	-8633

duration = 1 min 59 sec
completed successfully
finished Wed Jan 31 15:30:31 2024


========================================================================